Chum salmon swim beneath the surface of Salmon Creek on Aug. 3, 2015. (Michael Penn, Juneau Empire File)

Rock slide in B.C. river may hinder salmon passage

DFO says it is aware that the slide occurred in a narrow portion of the Fraser River

The Department of Fisheries and Oceans says it is aware of a “significant” rock slide that occurred in the Fraser River in British Columbia, which could possibly hinder the passage of returning salmon.

Rancher Tom Hancock says the slide happened Tuesday morning north of the Big Bar Ferry, causing a disturbance in the river.

In a statement, the fisheries department says it is aware that the slide occurred in a narrow portion of the Fraser River.

The department says it has conducted an aerial survey of the site.

It says it will be sending another crew of engineers and habitat specialists into the remote area on Wednesday to determine the extent of the blockage.

ALSO READ: DFO to test for harmful virus at B.C. fish farms

It says it will be working with the province and local First Nations on next steps. (CHNL)

The Canadian Press

Like us on Facebook and follow us on Twitter.

Just Posted

Academic excellence achieved

Rimbey high school students do well

Snow expected within the next 24 hours

Snowfall expected in Rimbey and area

VIDEO: A brief history of bumps in the Trudeau-Trump relationship

Remember Peter Navarro saying ‘there’s a special place in hell’ for a foreign leader who aims to cheat?

Rebels win second in row 5-2 over Moose Jaw

32 saves from Goalie Byron Fancy leads the way for Red Deer

Nearly 40% of Canadians want creationism taught in schools: poll

23% of Canadians believe God created humans in the past 10,000 years

Blackfalds RCMP lay charges following fatal pedestrian collision

35-year-old male died in the hospital as a result of injuries

Canadian families could pay nearly $500 more for food in 2020: report

Meat prices will increase the most, the report suggests

UPDATE: All lanes have reopened at Hwy. 611

No serious injuries reported

Trans Mountain pipeline will be the ‘best darn pipeline in the world,’ says CEO

Pipeline expansion is expected to take 30 to 36 months to build

Bentley farmer finishes baling hay on Nov. 29

Baling snow covered hay requires persistence

Most Read